Buy Macro MA-20WODP Gas Water Heater in Singapore - City Energy Life — City Energy Pte. Ltd. (as Trustee of City Energy Trust)
icon Skip to content

MA-20WODP (Condo Model)

by Macro
Current Price $989.00
Original Price Original Price $1,202.00
Installation Options

There is nothing more satisfying than a hot shower after a long day — with the help of a gas water heater. City Energy offers a wide range of high-quality heating appliances powered by piped town gas.

The benefits of using piped town gas-powered heating appliances include:

  • Greater Savings: In comparison to an electric storage water heater, a household can save $1200 by using a gas water heater based on a study by NEA.
  • Carbon Emissions Savings: Using a gas water heater saves an approximately 80% reduction in carbon emissions* compared to the electric storage water heater.

*Source: Based on a study conducted by National University of Singapore (NUS) Prof Lee Siew Eang.

This is an outdoor gas water heater, comes with a weather proof body for outdoor installation i.e the AC ledge at the external of the building

  • Gas fired instantaneous water heater
  • 20L per min
  • Hot water to 4 points of usage
  • Mobile APP controlled
  • Wide range of temperatures setting up to: 60°C
  • 26 safety features incorporated
  • Hydraulic type pulse ignition
  • Forced exhaust
  • 220 – 240V / 50Hz rated voltage
  • Built-in pump – allows for water to be pre-heated in a hot water pipe loop to reduce water wastage especially in larger apartments where hot water usage points are more than 10 meters from the gas water heater.
Important Notes:
  • If No Installation required, the price quoted is for the supply and delivery of the gas water heaters only. You will need to engage the supplier or a Licensed Gas Service Worker (LGSW) to carry out the installation work.
  • If Installation (Standard Installation/Replacement) required, the price quoted is inclusive of the cost for the supply and delivery of the gas water heaters, and the installation cost.
  • All installation work is subjected to compliance with the local authorities requirements.
  • Delivery Lead Time: 3 Working Days.